The HV2 Barrier is the world’s first approved and hugely sought after TL-4 unanchored crash barrier for rent.
The HV2 barrier rental solution offers longitudinal system with low deflection and high containment, showing incredible stability whilst being crash tested with a 10,000kg truck. This temporary crash barrier is approved by the Austroads Safety Barrier Assessment Panel (ASBAP) to 100km/h.
Cost-effective to transport and deploy, MASH TL-4 barrier for hire features patented hybrid technology. Unique connectors allow the this barrier to be freestanding whilst offering high containment and low deflection.
We offer a turn-key solution in unanchored crash barriers for hire, and all deployments will be solely managed and certified by the Road Safety Rental team.
The advantages of HV2 barrier hire include:
Effective Length | 5.8m |
Height | 900mm |
Width | 450mm |
Weight | 2088kg |
Weight Per Metre | 360kg |
Succesfully Tested To | MASH TL-4 |
ASBAP Approval to | 100km/h |
MASH TL-3 Deflection | 1.47m |
MASH TL-4 Deflection | 2.37m |
Amount Transportable Per Semi Truck | 10 |
Multiple End Treatments Can Be Used | Yes |
Lightweight | Yes |
High Containment | Yes |
Safe Redirection | Yes |
Fast Deployment/Retrieval | Yes |
No Anchoring Required | Yes |
Economical To Transport | Yes |
Maintenance Free | Yes |
Durable | Yes |
A minimum TL-4 barrier system with low deflections and no pinning was required whilst works were carried out by Fulton Hogan Hull McIlwain Joint Venture (FHHMJV) on The Coomera Connector Project, a future state-controlled transport corridor designed to run between Loganholme and Nerang, situated east of the Pacific Motorway (M1) and the heavy train line.
HV2 Barrier not only satisfied the requirements on this contract but also offered additional benefits including a compact footprint, ease of deployment, and cost-effective transportation. Nearly 500 metres of HV2 Barrier were successfully installed by the Road Safety Rental team. The deployment, carried out during a 6 hour night shift, proceeded smoothly thanks to FHHMJV’s excellent coordination and the tireless efforts of the traffic team, who ensured both efficient site access and effective safety measures. The HV2 Barrier’s successful integration into the Coomera Connector Project highlights its effectiveness in meeting stringent safety requirements and operational efficiency.
Road Safety Rental were engaged for a busy Canterbury Road project due to the unique requirements of the project. The head contractor was required to maintain maximum lane width whilst also protecting workers upgrading slip lanes for future growth. The HV2 Barrier was perfect for this project with its narrow 450mm footprint, and freestanding TL-4 rating ensuring the protection required. A maximum lane width could be maintained in a tight job. Deployed at night within the road closure time to allow for road opening on the next day and incorporating the T-Lok and T-Lok wedge to provide maximum protection around the intersection, Road Safety Rental delivered the perfect solution for the clients needs.
The Road Safety Rental team has embarked on their largest deployment of HV2 Barrier yet, on a night shift along the Melton Hwy. Unprecedented traffic volumes delayed the start and traffic set up, but in less that 5 hours and in challenging conditions, 650m of HV2 barrier was installed, leaving the client, subcontractors and workforce stunned! HV2 is proving to be sought after for its superior deflection, small footprint, and record deployment times.
Road Safety Rental were recently appointed by Healey Infrastructure to manage a major temporary safety barrier installation on the M80 Ring Road in Melbourne, while another major infrastructure program was being delivered. The Road Safety Rental team have worked successfully with Healey Infrastructure on many occasions. The entire team were excited to witness the very first Australian installation of the world's only MASH TL-4 freestanding temporary barrier system; the Saferoads HV2 Barrier on Thursday 18th March, 2021. The deployment was a fantastic success with approximately 600m of HV2 Barrier and four segments of QuadGuard End Treatments being installed in a single night shift with an install team of four of Road Safety Rental's best!